The project
The roof. We removed the old shingles, checked and repaired the decking where needed, and installed drip edge, Ice & Water Shield at the eaves and under open W metal valleys, synthetic underlayment, IKO Leading Edge starter, and IKO Cambridge shingles with six nails each.
Vents and flashings. All eight old roof vents were replaced with Duraflo attic vents, with two new goosenecks and two new plumbing flashings, and the chimney flashing sealed with a UV-resistant sealant.
Eavestrough. We removed the old eavestrough and installed new 5-inch steel eavestrough and downspouts.








