Skip to content

High River Roofer & Roof Replacement

Roof replacement, metal roofing and siding for High River homes, from the older streets near downtown and the river to the newer neighbourhoods on the north and west side of town.

Speak with a real person, 7 days a week.

★★★★★4.9on Google · 35+ reviews

“They explained exactly what the work would entail, and what it would cost. The standard of work was top notch.”Google review

Roof inspection on a two-storey home with box vents

Recent job by our crewRoof inspection on a two-storey home near Calgary.

  • HAAG® certified roof inspector
  • 10-Year Labour Warranty
  • One-year follow-up inspection
  • WCB-covered, harnessed crews

★★★★★4.9 on GooglePrefer to talk? (403) 333-0319

Request your quote

Tell us what your High River home needs. It takes about a minute.

Step 1 of 4
Pick one roof option. Add siding if you need it.

No-obligation quote · Your details stay private

Highly Rated
HAAG Certified Inspector
25 Years of Experince
5000+ Completed Projects
Malarkey Emerald Pro Contractor

★★★★★

“Excellent value and quality. I had Bears Valley Roofing replace my roof a few years ago after comparing a few different companies and was very happy with the quality and value.”

K.L. · Google review

★★★★★

“My roof install only took two days. They were very easy to work with and always on time.”

O.P. · Google review

★★★★★

“These guys are amazing. Super professional and polite. They installed my roof about 2 weeks ago and did an exceptional job. Highly recommend going to them!!”

J.B. · Google review

A High River roofing company for older homes and newer streets

High River is a town of about 14,000 on the Highwood River, a short drive south of Okotoks. It has character homes and bungalows near downtown and along the river, newer two-storeys on the edges of town, and acreages out toward Aldersyde. The chinook winds that come off the mountains can gust hard here, and roofs, siding and eavestroughs take the brunt of it.

We have replaced roofs in and around High River, including a commercial roof downtown and homes out toward Aldersyde. Every job starts with a roof inspection and a written quote, and every finished roof gets a follow-up visit a year later.

10-yr

Labour warranty in writing on every roof

1-yr

One-year follow-up inspection

HAAG®

Certified inspector on staff

Roof inspection on a two-storey home with box vents and neighbouring houses

Roofing & exterior services in High River

Our High River work is full roof replacement, often paired with new siding and eavestroughs on the same house so everything matches and the job runs on one schedule.

Roof tear-off down to the deck before new underlayment, drone view

Our specialty

Roof Replacement

Tear-off to the deck, new underlayment and ice protection, fresh vents and flashing, and architectural shingles or metal on top.

Front of a two-storey home with new fibre cement siding and trim

Exteriors

Siding Replacement

New vinyl, fibre cement or metal siding for High River bungalows, two-storeys and acreage homes, matched to garages, trim and gables.

Roof vent and flashings checked during a roof maintenance visit in Cochrane, AB

Roof maintenance

35-Point Roof Tune-Up

For roofs that aren’t ready for replacement: we reseal flashings and vents, replace damaged shingles and check for weak spots. Typically $1,500–$5,000 + GST, with a 2-year warranty.

Additional exterior services

Property types

  • Bungalows & two-storey homes
  • Character homes near downtown
  • Acreage homes & outbuildings
  • Commercial roofing

Asphalt shingle roofing in High River

Most High River neighbourhoods were built with asphalt shingles, and after years of prairie wind and weather, a lot of those original roofs are showing their age. With Alberta’s freeze-thaw cycles, asphalt shingles usually need replacing at around 15 years, and cedar shake can last a bit longer. An inspection tells you exactly where your roof stands. A proper re-roof here means taking everything down to the wood, then building it back as one system: synthetic underlayment, ice and water membrane along the eaves and in the valleys, balanced intake and exhaust roof ventilation, new metal flashings, and shingles nailed to the high-wind pattern. See how a replacement is done.

Malarkey Emerald Pro certified contractor

Malarkey Emerald Pro™ certified contractor

Emerald Pro is the top level of Malarkey’s contractor program. Our crews install the full Malarkey system, which is what qualifies eligible High River roofs for enhanced manufacturer coverage.

Architectural shingles

Most popular

Thicker, layered shingles that most High River homeowners choose when their original three-tab or first-generation roof comes off.

Impact-rated shingles

A tougher, heavier shingle that resists cracking and scuffing, a good fit for homeowners planning to stay for years.

Designer shingles

Slate- and shake-look profiles for custom homes and acreages around High River.

Every High River roof includes our 10-Year Labour Warranty, and some shingle lines add manufacturer coverage of up to 50 years.

Architectural shingle roof with hips, box vents and a plumbing vent
Architectural shingle roof in a suburban neighbourhood
Black standing-seam metal roof on a cedar-sided mountain home
Standing-seam metal roof on the dormers of a cedar-sided home

Built for wind

Metal roofing for High River homes

When a High River roof is due for replacement, many homeowners ask whether to skip shingles this time and go to metal. A steel roof has no loose edges for a gust to catch, it sheds snow quickly, and it lasts much longer than shingles. The trade-off is a higher price today, which is why we quote both options on the same visit so you can compare. Read about metal roofing.

  • Standing-seam and exposed-fastener steel
  • Nothing loose for the wind to catch
  • Homes, detached garages and sheds
  • Priced next to shingles on one visit

Siding replacement in High River

High River siding faces the same wind and full prairie sun as the roof, and on many homes the original vinyl is now faded, brittle or cracked, usually worst on the south and west walls. Plenty of owners do the siding in the same season as the roof and eavestroughs, so colours line up and the crews work back to back. Before any new panel goes up, we wrap the walls and flash every window, door and corner. See siding options.

Fibre cement

Our top pick

Won’t burn, dent as easily or move with the seasons, and the baked-on colour lasts. Available as lap, board-and-batten or shingle profiles.

Vinyl

The budget-friendly choice, easy to live with, and a fast way to give a High River two-storey a completely new look.

Metal siding

Tough steel panels for garages, feature walls and modern builds, and a natural pairing with a steel roof.

Two-storey home with new dark board-and-batten and white lap fibre cement siding
Aerial view of new fibre cement siding on a two-storey gable

What goes into a High River re-roof

A new roof is the chance to fix what the original installation rushed. These are the four places we spend extra time on every High River roof.

Old roof stripped during a roof replacement, drone view

01

A sound deck under everything

With the old roof off, we look over the whole deck, swap out any soft or damaged boards and nail it back down properly, so the new roof sits on something solid.

Roof with pack of asphalt shingles

02

Ice and water protection

A waterproof membrane at the eaves and in every valley keeps melting snow and wind-blown rain out when a mild day is followed by a hard freeze.

Skylight and flashing checked during a roof inspection

03

Flashing around skylights & vents

Skylights, pipe boots and vents are where most leak calls start. On a new roof we replace the boots and vents and re-flash each skylight rather than reusing worn parts.

Roof ridge cap and exhaust vent on a suburban home

04

Nailing and ridge caps for wind

The right nail placement, sealed starter rows along the edges and well-fastened ridge caps keep the roof in one piece through prairie windstorms, and keep the shingle warranty intact.

How a High River roof replacement works

Here is how a High River roof replacement runs, from the first visit to the check-up a year on. Once materials are on site, most houses are done in one or two days.

Before any High River quote is written, we inspect the roof in person and photograph anything that needs attention. Our team includes a HAAG® certified roof inspector.

  1. 01

    Roof inspection

    We walk the roof, checking shingles, flashings, vents and ventilation, and photograph anything that needs attention so you can see it for yourself.

  2. 02

    Your quote, in writing

    Every material, the full scope and the timeline on one page, with siding or eavestroughs priced alongside if you want them done too.

  3. 03

    A clean, careful install

    The bin placed out of the way, magnetic sweeps for nails and a tidy site at the end of each day.

  4. 04

    Final walkthrough, then a return visit

    We go over the finished roof together, then come back a year later to check it once it has seen a full winter and a spring melt.

Signs a High River roof is ready for replacement

Original shingles reaching the end

Whole High River streets were built or re-roofed in the same few years, so their roofs are wearing out together. Granules in the eavestroughs, curling tabs and bare patches are signs it is worth booking an inspection.

Shingles lifting in chinook winds

Warm, gusty chinooks can lift tabs and ridge caps that have lost their seal. When it keeps happening, an inspection tells you whether it is time for a new roof fastened to the high-wind pattern.

Stains around chimneys and vents

Older High River homes often have chimneys, dormers and several roof levels. A stain near any of them usually means the flashing is worn, and a replacement is the time to re-flash every one.

Low-slope sections on older homes

Additions, porches and back rooms on older homes often have low-slope roofs that were shingled below their rated pitch. A re-roof is the time to put the right membrane on them.

Faded siding and tired eavestroughs

If the roof is due, the siding, soffit and eavestroughs on the same house usually are too. Doing them together keeps colours matched and gives water a clear path away from the foundation.

Lower roofline of a two-storey home during a roof inspection
Rooflines on a two-storey home, checked during a roof inspection
Shingle eave edge with drip edge and eavestrough
Drip edge and eavestrough along a shingle eave

Our promise to High River homeowners

10 / 50

Warranty in writing

Your High River roof includes our 10-Year Labour Warranty in writing, and select shingles add manufacturer coverage of up to 50 years.

WCB

Safe, respectful crews

WCB-covered crews, harnessed on every roof, who keep your driveway and the sidewalk clear while they work.

1 year

A visit one year later

After the final walkthrough, we book a visit a year out to check the roof once it has been through its first High River winter.

Serving High River, Aldersyde & the Foothills

We work across High River, from downtown and the older streets by the river to the newer neighbourhoods on the north and west side, plus Aldersyde, the acreages around town, Okotoks and Foothills County. Nearby, see our pages for Okotoks, Nanton and Diamond Valley.

  • High River
  • Downtown High River
  • Northwest High River
  • Aldersyde
  • Okotoks
  • Nanton
  • Diamond Valley
  • Foothills County

Real questions from High River & area

These came from homeowners and businesses in and around High River, including Okotoks and Nanton. We have removed names and addresses, but the questions are real.

Commercial building

“Our building leaks in several spots every time it rains. Can you quote a repair or a new roof?”

Yes. We start with an inspection, trace where the water is getting in and send you photos with a written scope. If the roof still has life left we price the repair; if it is near the end, we quote the replacement.

Roof inspection →
Whole exterior

“We want new siding to match the garage, a new asphalt roof, and new soffit, fascia and eavestroughs on our two-storey. Can one contractor handle the whole project?”

Yes. We put the roof, siding and eavestroughs on one quote and book the crews back to back, so the colours match and you deal with one schedule instead of three.

Siding options →
Buying a home

“We are looking at buying a house nearby and want a quote to redo the roof before we decide.”

We inspect the roof, photograph what we find and give you a written quote, so you know what the roof will cost before you buy.

Roof inspection →
Acreage

“We just moved to an acreage and our large barn needs a new roof. Can you come out and quote it?”

Yes. We quote barns, shops and garages as well as homes, in shingles or metal. We measure on site and price both options side by side so you can compare.

Metal roofing →

High River roofing questions

Don’t see your question? Call us at (403) 333-0319.

It depends on the size and pitch of the roof, how many layers come off, the condition of the deck and the shingle or metal you choose. We inspect the roof first, then give you a line-by-line written quote you can compare with other High River roofing companies.

Our inspector decides that once they have seen your roof. We check the whole roof, show you photos and tell you honestly how much life is left. If a repair makes sense we price it; if the roof is near the end, we quote a replacement you can plan on your own timeline.

Yes, full roof replacement is most of our High River work, on homes in town and on acreages around Aldersyde. We tear off to the deck, fix any soft decking, and install a complete system with new underlayment, ice and water protection, ventilation and flashings, finished in architectural shingles or metal.

Yes. We replace vinyl, fibre cement and metal siding and install seamless eavestroughs, downspouts, soffit and fascia. On many High River homes all of it is the same age, so we can quote the roof, siding and eavestroughs as one project.

Once materials arrive, a typical High River house takes one to two days. Larger or steeper roofs, and jobs that add siding or eavestroughs, take longer, and we give you the schedule in writing up front.

Our 10-Year Labour Warranty covers every roof we install, and select shingles carry manufacturer warranties of up to 50 years. A year after the job, we come back to check the roof once it has been through a winter.

All of High River, plus Aldersyde, Okotoks, Nanton, Diamond Valley and the acreages in Foothills County.

Ready for a new roof in High River?

Tell us a little about your home and what it needs, and we will set up an inspection and send a clear written quote.