Skip to content

Exterior Renovation in Calgary: Roof, Siding and Eavestroughs on One Quote

Replace the roof, siding, soffit, fascia and eavestroughs in one project. One crew, one quote, one schedule, and every joint between them flashed properly.

★★★★★4.9on Google · 35+ reviews
Prefer to talk? (403) 333-0319
  • One quote for the whole exterior
  • One crew and schedule
  • Every joint flashed
  • 10-Year Labour Warranty

★★★★★4.9 on GooglePrefer to talk? (403) 333-0319

Request an exterior estimate

Tell us which parts of the exterior you want to replace.

Step 1 of 3
Choose all that apply.

No-obligation quote · Your details stay private

Front of a two-storey home with new fibre cement siding and trim

New exterior, two-storey home

Why do it all at once?

Roofs, siding and eavestroughs meet at the same edges. When they are replaced years apart, each trade works around the last one’s flashing. When they are done together, we lap every layer the right way, from the ridge down to the foundation.

You also deal with one contractor, one site set-up and one clean-up.

  • Layers lapped top to bottom
  • Colours planned together
  • One site set-up
  • One point of contact
New dark shingle roof on a stucco home in south Calgary, drone view

New roof on a two-storey home

Roof to foundation, planned together

Pick your roof: architectural, designer or Class 4 shingles, standing-seam steel, cedar shake or Euroshield rubber. Pick your walls: James Hardie fibre cement, vinyl or steel siding. Then we add new soffit, fascia and eavestroughs to match. Roof-to-wall joints are where ice dams cause leaks, so we flash them while both are open.

With Alberta’s freeze-thaw cycles, asphalt shingles usually need replacing at around 15 years, and cedar shake can last a bit longer.

  • Roof, walls and roof edge
  • Matching trim and colours
  • Window and door flashing
  • Photos at every stage

What we can include

Choose the parts you need. We quote them together.

Every roof type we install

Architectural, designer and Class 4 shingles, standing-seam steel, cedar shake and Euroshield rubber.

James Hardie fibre cement

Tough, heavy and fire-resistant.

Vinyl siding

Light, low upkeep, lots of colours.

Steel siding

Modern lines that pair with a steel roof.

Eavestroughs, soffit and fascia

New eavestroughs, vented soffit and aluminum fascia, done while the roof edge is open.

Exterior renovation questions

Want a single quote? Call (403) 333-0319.

You save on set-up, disposal and a second round of disruption, and the joints are done right the first time.

It depends on the house, but most take one to three weeks.

Yes. We bring samples and can show you combinations that suit your house.

Yes. We can plan it so the second phase ties in cleanly.

Ready to redo the exterior?

Send us a few details and we will book a time to measure.